Job completed for Todd F. - Rockaway, NJ
Completion date: October 25, 2023
Location: Rockaway, NJ
Why did the customer contact us?
Todd reached out to PDQ due to a mold problem. The mold was growing in the second-floor bathroom closet. It was due to a small leak in a pipe above the bathroom closet.
Solutions provided:
PDQ removed the walls and insulation in the bathroom closet. The pipe was fixed by a plumber. An air scrubber was run to collect any dust in the air from the demolition. Mold killer was sprayed on all exposed studs.
Team members on this project:
Azar Mamkagh, Nart Bachok, Chris Soffel