Job completed for Todd F. - Rockaway, NJ

Completion date: October 25, 2023

Location: Rockaway, NJ

Why did the customer contact us?

Todd reached out to PDQ due to a mold problem. The mold was growing in the second-floor bathroom closet. It was due to a small leak in a pipe above the bathroom closet.

Solutions provided:

PDQ removed the walls and insulation in the bathroom closet. The pipe was fixed by a plumber. An air scrubber was run to collect any dust in the air from the demolition. Mold killer was sprayed on all exposed studs.

Team members on this project:

Azar Mamkagh, Nart Bachok, Chris Soffel

Photos & Videos:

Mold in Bathroom Closet
Large View Icon
Mold in Bathroom Closet
Removed Closet Wall and Insulation
Large View Icon
Removed Closet Wall and Insulation